Solution 4 Building were engaged as the Head contractor by the City of Kalamunda to perform refurbishment and installation works at the Forrestfield United Soccer Club.
SPECTATOR SEATING
- Removal of existing concrete retaining walls and concrete ramp, path and steps and addition of new covered spectator seating with steel framed roofing, storeroom and handrails/balustrades.
- Addition of new concrete apron and access ramps
CHANGE ROOMS 1, 2 & 3
- Removed walls and benches to existing storerooms.
- Brick infill to top of existing 2100mm high wall to full height (underside of ceiling). Allowing opening (penetration) for existing pipe work.
- New infill masonry wall to create new storeroom. Paint to match existing.
- Cut/removed walls to create entry alcove to change room 2 & 3
- Removal of existing benches and new benches installed.
- Removal of existing floor tiles to entry alcove and new floor tiles installed to match existing.
- Added new masonry walls. Paint finish were to match existing.
TUNNEL
- Removed existing brick paving, roller shutter and steel gates.
- Cut out walls for entry to change rooms.
- Added new concrete slab to extend from existing.
- Added new wall with double doors to tunnel to replace roller shutter.
- Added new walls and door for new physio room and storeroom. Including a 90-minute fire rated wall between physio and store.